Dahe Solar Power Project in Zhangjiakou, China

This project is only available to enterprise users for purchase of more than 100 credits

PROJECT ACTIVITY

The project was a part of a national demonstration activity.

The demonstrated technology has been applied in over 20 provinces in China.

The project supplied green electricity for the 2022 Winter Olympics.

Dahe Solar Power Project in Zhangjiakou, China

Project Location

China, Asia
Zhangjiakou, Hubei Province

Verification Status

Verified by Clean Development Mechanism (CDM)
55,045 estimated annual emission reductions

Project Profile

Carbon Avoidance
Solar Power Project

Project Proponent

Zhangjiakou Wind and Solar Power Energy Demonstration Station Co., Ltd.
State Grid Xinyuan Company

EARTHONLY'S IMPACT AND RISK ANALYSIS

background

Sign in for Impact and Risk Anlaysis

Please sign in to view the project page.

EARTHONLY'S PRICING GUIDANCE

background

Sign in for Pricing Guidance

Please sign in to view the project page.

SUSTAINABLE DEVELOPMENT GOALS

PROJECT INSIGHTS

The project is a Greenfield solar power power project with the installation and operation of total 40 MW solar PV project which will supply an average annual generation of 61,448 MWh of electricity to the North China Power Grid (NCPG) annually. This will replace the electricity generated by fossil fuel based power plants connected to NCPG.

The project was a part of a national demonstration project for integration of wind, PV, energy storage and transmission. The demonstrated technology has been applied in grid-connected renewable energy in over 20 provinces in China which increased the grid resilience for renewable power and decreased the abandonment of installed solar and wind. The project team also assisted over 15 countries globally with renewable energy usage. The project had also impacted the local community by creating job opportunities.

The project won national-leveled awards for technology, engineering, and management. One IEEE standard, 13 Chinese national standards, and 21 industry standards were introduced and led by the project team.

The intent of the project was to find the path of development and access to renewable energy by way of demonstation, and therefore the project has been implemented despite lower project IRR of around 3.30%-6.07%. This demonstates that the project activity is additional.

EarthOnly Logo
EarthOnly is your partner in achieving sustainability of our Earth through its impactful technological interventions.
Contact Us:
203, 2-A/3, Kundan Mansion, Asaf Ali Rd, New Delhi,
Delhi, India - 110002
© 2023 Earthonly. All rights reserved.